The newly constructed South Devon Link Road is a 5.5km dual carriageway built to bypass the existing A380 between Newton Abbot and Torbay to ease congestion through the village of Kingskerswell and to improve the connection of Torbay into the Highway Infrastructure, paving the way for an improved local economy. First proposed over 50 years ago, the project was granted full approval in May 2012 with work beginning in the autumn of that year.

In development and testing over the four years preceding the commencement of the SDLR project, QMS HyperGrip™ is a brand new high friction surfacing treatment from Quality Marking Services Limited.

Designed using a cold applied methyl methacrylate (MMA) resin, HyperGrip™ can be installed to new bituminous surfaces after just 12 hours and boasts a maximum cure time of one hour, minimising disruption to road users and reducing costs to the client by removing the need for extended traffic management.

Part of the project requirement was to use as many local contractors and suppliers as possible and approximately 50% of the workforce employed to construct the road were from the surrounding areas.

Quality Marking Services Limited (QMS) was engaged by the principal contractor, Galliford Try, in August 2014 to install the line marking, road studs and high friction surfacing to the bypass as well as £25,000 of temporary works required throughout the project to enable the fluid movement of traffic around the construction site.

White Curve

QMS HyperGrip™

Galliford Try engaged Quality Marking Services Limited in a sub-contract to carry out all road markings to 6km of dual carriageway, 8 slip roads and 20 side roads on the South Devon Link Road. The sub-contract also encompassed the installation of 8,700m2 of QMS HyperGrip™ high friction surface treatment.

As Pavement Agent, I was in direct contact with QMS throughout the course of the project to co-ordinate and deliver the above works to the project programme specification and deadline.

A significant amount of the work was carried out at night under traffic management. I found QMS to be extremely adaptable in their resourcing to ensure the road markings and high friction surfacing installations could be achieved within the tight deadlines.

In the final weeks of the project, prior to the link road opening to the public in December 2015, bad weather slowed operations and the delivery of the high friction surfacing became the critical path in programme completion. Throughout this period QMS worked closely with Galliford Try to mitigate the risk of delay and delivered the works on time to meet the opening deadline.

The flexibility demonstrated by QMS enabled us to overcome both the technical and weather related challenges of programme and I would highly recommend QMS for future projects.

Richard Gallagher, Galliford Try, February, 2016

As a prestigious local road marking and specialist surfacing company, QMS met the criteria for the £340,000 contract and with a brand new BBA HAPAS Type 1 High Friction Surfacing Treatment, QMS HyperGrip™ recently launched to the market, QMS were able to deliver a combined road marking and anti-skid solution, further enhancing the service offering to the project. QMS began lining work on the Link Road in February 2015 with the QMS HyperGrip™ installations from September. A combination of day and night work was programmed to fit in with planned closures and to meet the demands of the client.

Throughout the duration of the contract temporary road markings were installed to specified sites to reduce disruption to the flow of traffic on diversion routes and to ensure it was managed effectively.

Over the following months, QMS installed over 3,000 Road Studs, 8,000 metres of Ribline and centre lane line along the length of the bypass including ancillary markings, junctions, arrows and letters.

The contract required the installation of 8,700m2 of QMS HyperGrip™ High Friction Surfacing across 3 sites along the link road: Edginswell Lane Junction, Penn Inn Flyover and the Riviera Way which used a combined total of 70,000 tonnes of aggregate and over 25,000 tonnes of resin.

Despite poor weather conditions hindering progress throughout November and December, QMS Crews worked tirelessly to complete the installations in time for the opening of the Road on Tuesday 15th December.

“Programming the works for the South Devon Link Road proved challenging from a logistical standpoint. The flurry of activity during the final phase of the link road’s construction meant that we had to collaborate closely with other contractors working on the bypass to ensure that we were all able to complete our respective works in time for the opening.

Despite the difficulties with logistics and unpredictable weather impeding progress, the challenges fuelled a considerate working environment across all workers onsite and it was a pleasure to work alongside Galliford Try and other contractors on the scheme.

The entire QMS team are incredibly proud to have played a part in the construction of such a high profile local project and it’s fantastic to see the road open and delivering on its pledge to alleviate congestion through Kingskerswell.”

Andy Smith, QMS Contracts Manager

Blue Curve

Let QMS deliver beyond your expectations,
talk to our team today

01626 836 777
EXCELLENT
Google star 1Google star 2Google star 3Google star 4Google star 5.0.7
Based on 31 reviews
Posted on Google Google
Sam Mellor-Clark profile picture
Sam Mellor-Clark
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
There has been a couple of crews doing the lining and antiskid works local to me on the new surfacing project on Callington road, Tavistock and the quality of work is spot on. Its done nothing but rain here for the last 2 months and as someone who spent over 25 years lining I can appreciate what they`ve been up against, especially with anti skid and MMA lining materials.
Posted on Google Google
Dejan Maric profile picture
Dejan Maric
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The attention to quality and detail within this company is very high and customer concerns are always rectified, leading to high client retention. The company invests heavily into training and development for its staff with some of the best equipment available.
Posted on Google Google
Catherine Harvey profile picture
Catherine Harvey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Greg and all the team are professional, friendly and passionate about the work they deliver. I would always recommend QMS for any line marking needs as there attention to detail and care is shown in the work delivered.
Posted on Google Google
Alison Lott profile picture
Alison Lott
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent service - friendly, polite, helpful. Had my Disabled bay marked out quickly and efficiently, after a 5½ month wait for Highways! Thanks guys. Thanks guys
Posted on Google Google
Dan Druft profile picture
Dan Druft
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Everyone is so helpful
Posted on Google Google
Timothy White profile picture
Timothy White
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We had them out a few times to our Production sites, and the level of communication with the quality of work is just what we were after! I would recommend them!
Posted on Google Google
Luke Davis profile picture
Luke Davis
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great company! I recently used this company for a last minute job. They were really busy but they managed to squeeze me in. It’s really nice to work with a company that come out in person and really listen to what you need, and then work with you to achieve it! Thanks QMS, you were great! Highly recommend!
Posted on Google Google
Lena Haydon profile picture
Lena Haydon
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent customer service, very good communication. The whole process was smooth and professional. Very pleased with the quality of work, would employ again and would have no hesitation recommending to others.
Leave a review on Google
01626 836 777

Contact us

01626 836 777

info@qms.uk

Fairfax Road
Newton Abbot
TQ12 6UD